Earth Series
(NANO) SF SERIES
Pluto Series
Neptune Series
Jupiter Series
Matt Series
Double Charge Pulati Basic Series
Double Charge Pulati Light Series
Double Charge Pulati White Series
Double Charge Pulati Dark Series
 
Valued Clients
Highlights
One of India’s leading manufacturers of compact fluorescent lamps (“CFLs”) and vitrified tiles.
We manufacture over 30 models of CFLs, including both retrofit as well as non-retrofit types.
Our CFL production capacity is 200,000 units per day.
Our tiles currently come in 15 colors and 42 designs.
Our vitrified tiles are manufactured using single-firing technology.
Vitrified tiles plant is the largest in India in terms of installed manufacturing capacity (Source: GITCO, January 2008).
We have designed our own E-Bikes for the Indian market.
Nationwide sales and Distribution Network.
Strong In-house Research and Development.
Experienced and Proven Management Team.
OREVA Bikes which are specifically designed and adapted for the Indian market.
 
 
 
Search ››
 
 
Laying Instructions
 
Before Installation of Tiles
 
  • The surfaces were the tiles are to be laid must be properly finished and curing done at least for one week.
  • Care should be taken that iron rods used in concrete are not exposed at any place. If the tiles are laid with exposed iron rods subsequently there may be rust formation and air bubbles that may lift up the tiles.
  • The total area to be covered should be worked out and additional 5% should be included towards wastage / breakage for order, so it doesn’t lead to shade variation on re -ordering.
  • In case of multistory building it is advisable to order entire quantity of each floor from the same batch in one lot to avoid shade variation, so you can achieve desired combination on each floor.
  • Before fixing the vitrified tiles lay them in the desired pattern and make sure that they give proper shade and design. The Company Will Bear No Liability After The Tiles Are Fixed. So please ensure uniform level, shade and design before fixing the tiles with concrete.
 
Installation of Tiles
 
  • The Process of Laying Tiles is in 3 ways where floor tiles may be used.


  • A. Laying the tiles over concrete in new building using sand and cement mortar.
    B. Laying the tiles with chemical adhesive in new building.
    C. Laying the tiles over the existing floor of old tiles. (Marble, Granite, Mosaic, Kota etc.)
A. Laying the tiles over concrete in new building using sand and cement mortar
 
  • The bed surface should be perfectly clean and free from dust, paint, scraps, grease, oil etc.
  • If the bed surface has been left dry for a long time it should be washed and made sufficiently cured.
  • Make suitable bedding using cement and sand mortar with the ratio of 1:4 along with water to make a consistence paste, use this paste to make a bedding of 20 to 30 mm thickness after checking the levels through 4 corners of the area.
  • Kindly look for the arrow on the back of the tile and always follow any one laying pattern as shown here.
 
Never follow following pattern:
 
  • If the arrows are not followed the proper design may not be achieved and also it may affect the alignment of the tile.
  • The work size will be as per ISO specifications. As part of internationally accepted laying practices, use of 2 to 5 mm spacers recommended
  • Apply fine cement slurry to the back of the tile to ensure proper and full bonding on the surface.
  • For proper bonding Press the tiles gently with a wooden mallet to make proper adherence. (Don’t use iron hammer or any heavy material to press the tile).
  • After fixing the tiles, extra mortar etc. should be cleaned with wet cloth or sponge and allow setting for two days, please avoid walking on the tiles for these two days.
  • After proper setting, the tile should be suitably cleaned and there after grouting should be done with matching grout.
  • Since most of the carpentry, electrical or interior works are done after the installation of tiles, it is important to provide a protective cover on surface of the tiles, it is recommended to use POP of 12 to 15 mm thickness and this shouldn’t be opened until area becomes ready for occupation
  • Use of newspaper below the POP should be avoided since the printing ink and other black spots of the newspaper are likely to leave permanent stains on the tiles, it is recommended to use thin plastic layer on the surface.
  • The tiles can also be cleaned by mild acid; however Hydrofluoric acid and its derivatives should not be used without knowing its actions and reactions. You may concern the chemical properties and reactions for the clearance of the stains to our technical experts as and when required on info@oreva.com. Our technical experts will assist you as soon as possible for further proceeding of your problems
 
B. Laying the tiles with chemical adhesive in new building
AND
C. Laying of tiles over the existing floor of old tiles (on Marble, Granite, Mosaic, Kota etc.)
 
The same guidelines given above holds good for almost all the points except that instead of using fine slurry of cement at the back of the tiles appropriate chemical fixing adhesives available in the market can be used.
 
  • It should be ensured there is 100 % coverage of the adhesive behind the tiles.
  • The adhesives layer should be approximately 10 to 15 mm thickness.
  • While using adhesive it is very important to maintain level and flatness.
  • Setting / curing time should be allowed at least 2 days to avoid air bubbles or warpages on the tiles.
Please note that the company does not accept any liability in case problems arising out of non-adherence to these fixing instructions.
 
 
 
 
 
 
 
Oreva Group Company Products Quality Careers Dealers Technical Specification Media Projects Downloads
Tile Calculator New Launches Laying Instructions Privacy Policy Terms of Use Contact Us
All rights reserved - oreva.com Hosting support by: Dhanashree Inc., Web Design Company :eSparkinfo